Minutes

Meeting Date File
July 3, 2015

143. SPS beam dump in LSS5, SPS MKE4 kicker rearrangement, Status of the Linac2 source.

June 26, 2015

142. Leap second 2015, list of magnets after the fixed targets (AD, ISOLDE, n_TOF) requiring consolidation, SPSC Report.

June 19, 2015

141. SPS-CSAP report, New policy for vacuum acceptance tests, Report on the global optimisation made together by LIU and HL-LHC on the optimum location for the crab cavity test in SPS, Outcome of the SPS VVSA endoscopy, Status and prospects for COLDEX, Mandate for the decabling project, AD cryogenci current calibrator (BCCCA) status.

June 12, 2015

140. Measurement of vibration propagation from TT41 and TAG41 and their extrapolation to LHC, MSWG Report, PS-CSAP Report, Status of HIE-Isolde Cryo-module tests, PS wall current Monitor installation, impact of the new wall current monitors on the PS vacuum.

June 5, 2015

139. Status report on the NA62 ventilation system renewal, NA61 VTX-2 liquid helium repair pump.

May 29, 2015

138. ISOLDE HRS Target Coupling Issue. Safety File Working Group findings. Injector recommissioning working group status report. Cold tests of the AD CCC in the cryolab and cooling method in AD.

May 22, 2015

137.  Switching back from Argon ions to Lead ions in the injector complex, SU activities in the SPS north area during LS1 and YETS 2014-2015, Consolidation plan for the SPS electrical distribution, Decabling status for the PSB, PS and SPS, T2 & T6 movement in TCC2, AD CCC cool-down status, New PS booster orbit corrector converters - LIU feedback.

May 8, 2015

136. SPSC Report, AWAKE Technical status report, AWAKE budget review, responsibility for DC cables and busbars, status of COLDEX reinstallation, Additional PSB orbit corrector power converters, new frequencies for 4G network underground, progress of the AD CCC, T2 position in TCC2.

April 24, 2015

135. Mobile network switch debrief, AD Cryogenic Current Comparator status, Decabling Status for the PSB, PS and SPS, Status of the Marguerite System of the East Area, New access right conditions for the SPS and PS Complex.

April 17, 2015

134. List of de-cabling responsibles for equipment group, Status of the leaking 80 MHz PS cavity, Machine interlock for COLDEX, n_TOF target ventilation and access system, photographs of COLDEX intervention.

April 10, 2015

133. Update on the 80 MHz cavity in PS sector 8, Update on the CCC router redundancy, Realignment of COLDEX's by-pass and required corrective interventions, summary of successful completion of NA61/SHINE Argon run and plans for the repair of the VTX-2 helium pump, statement on de-cabling campaign in the injector complex.

March 20, 2015

132. Physics case for 2 GeV beams at ISOLDE, 2 GeV transfer line from PSB to ISOLDE, ISOLDE targets and dumps for 2 GeV beams.

March 13, 2015

131. Commissioning plans for HIE-Isolde, Recommissioning of REX-ISOLDE, CE updates on BA1 and BA2 Consolidation, length of YETS2015/2016.

March 6, 2015

130. PS/PS Booster wire scanner status report, INTC report ISOLDE, INTC Report n_TOF, reference measurement of PS magnets to validate radial shift, TPST  collimator exchange in SPS, AD BCCCA installation and discussion, Status of fiche réflexe, RP storage and waste capacity.

February 20, 2015

129. Status of the POPS capacitors, EATM report, CCC IT routers redundancy, SPS rotating collimator aperture for slow extraction, Mandate for the SPS fire safety WG.

February 13, 2015

128. 2016 AD shutdown work in preparation for ELENA, Upgrade of the cooling power in the SPS, First deliverz of argon at 150 AGeV/c.

February 6, 2015

127. Repair of the main Meyrin sub-station after the event of Oct 16th, LINAC4 source status, LINAC4 12 MeV status, IMPACT during run 2.

January 30, 2015

126. Status report on SPS rotating collimator test during 2015, SPSC report.

January 23, 2015

125. SPS doublet beam compatibility with users, ECRs, 80 MHz PS SS88 Cavity Issue, ELENA/g-bar cooling system update and needs from EN-CV.

January 9, 2015

124. LIU-SPS Project Updates, Short and medium plan to prevent flood in BAs and monitoring for CERN tunnels, North Area primary ion safety system global validation tests, report on the BE-CO smooth upgrades campaign 5-6-7 January

Pages

You are here